Exam 1: Measurement Methods for Construction Work
Exam 1: Measurement Methods for Construction Work17 Questions
Select questions type
The item of the brick structure measured in sq.m, is
Free
(Multiple Choice)
4.8/5
(78)
Correct Answer:
B
The 'centre line method' is specially adopted for estimating
Free
(Multiple Choice)
4.8/5
(95)
Correct Answer:
B
Pick up the incorrect statement from the following:
Free
(Multiple Choice)
4.9/5
(83)
Correct Answer:
C
Pick up the item of work not included in the plinth area estimate
(Multiple Choice)
4.8/5
(84)
The following item of earth work is not measured separately.
(Multiple Choice)
4.9/5
(75)
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
(Multiple Choice)
4.9/5
(78)
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
(Multiple Choice)
4.9/5
(77)
According to ISI method of measurement, the order of the sequence is
(Multiple Choice)
4.9/5
(77)
Brick walls are measured in sq. m if the thickness of the wall is
(Multiple Choice)
4.9/5
(83)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)