Exam 1: Industrial Revolution and Beyond: Ships, Fertilizers, BIM, Global Warming, and GIS

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

how many percent of carbon dioxide increased in the atmosphere since pre-industrial times?

Free
(Multiple Choice)
4.8/5
(79)
Correct Answer:
Verified

C

when a firm decides to transition to a BIM system from a traditional design process, there is more involved that just switching to a _______ modeling software.

Free
(Multiple Choice)
4.8/5
(76)
Correct Answer:
Verified

B

what is the main reason for melting of ice sheets?

Free
(Multiple Choice)
4.9/5
(80)
Correct Answer:
Verified

B

which among the following is not related to GIS software's?

(Multiple Choice)
4.8/5
(66)

during the industrial revolution many people moved______.

(Multiple Choice)
4.8/5
(76)

which one of the following result takes place due to global warming?

(Multiple Choice)
4.7/5
(73)

production of fertilizers is related to ______ revolution.

(Multiple Choice)
4.9/5
(77)

who measures the global warming rate?

(Multiple Choice)
4.9/5
(75)

which of the following doesn't determine the capability of GIS?

(Multiple Choice)
4.9/5
(71)

among the following, which do not come under the components of GIS?

(Multiple Choice)
4.9/5
(68)

for some ______ firms, the startup costs involved in implementing BIM can present significant challenges.

(Multiple Choice)
4.9/5
(86)

before steam powered ships sailed across the seas they used_____.

(Multiple Choice)
4.9/5
(75)

GIS uses the information from which of the following sources?

(Multiple Choice)
4.9/5
(79)

which among the following is a server based hardware platform of GIS?

(Multiple Choice)
4.9/5
(83)

the virtual building model in a BIM project, called a BIM model, serves as the foundation of the project.

(True/False)
4.9/5
(80)

the industrial revolution led to an increase in _______.

(Multiple Choice)
4.7/5
(71)

which of the following formats can be used for GIS output?

(Multiple Choice)
4.8/5
(86)

one of the first steps in implementing BIM is to appoint a_______.

(Multiple Choice)
4.7/5
(65)

human activities cause global warming.

(Multiple Choice)
4.8/5
(82)

in the process of GIS, digitalization is done for better output.

(Multiple Choice)
4.7/5
(85)
Showing 1 - 20 of 23