Before starting piling work, a complete knowledge of underground structures (such as sewers, water pipeline, gas mains etc.) is essential.

(Multiple Choice)
4.9/5
(76)

Heavy equipment, such as excavating machinery, trucks, dumpers, etc. should be kept away from the excavated sides at a distance not less than the depth of trench

(Multiple Choice)
4.9/5
(81)

In case of cantilever beam, reinforcement must be placed at the ....... of the member.

(Multiple Choice)
4.8/5
(72)

Which of the following is not a components of the system.

(Multiple Choice)
4.8/5
(66)

Special one time reports are information system used by