Exam 8: Construction Terminology and Techniques
Exam 1: Construction and Design25 Questions
Exam 2: Construction Terminology: Window Frames, Footings, and Building Materials25 Questions
Exam 3: Construction Terminology: Walls, Roofs, Piles, and More25 Questions
Exam 4: Building Foundation and Construction Terminology25 Questions
Exam 5: Construction and Building Terminology25 Questions
Exam 6: Construction and Building Foundations25 Questions
Exam 7: Various Terminologies in Construction and Architecture25 Questions
Exam 8: Construction Terminology and Techniques24 Questions
Exam 9: Foundations and Masonry Techniques: Exploring Depth, Loads, and Materials17 Questions
Select questions type
A bond consisting of heading and stretching courses so arranged that one heading course comes after several stretching courses, is called
Free
(Multiple Choice)
4.9/5
(57)
Correct Answer:
C
The minimum depth of foundation for buildings on clays is
Free
(Multiple Choice)
4.9/5
(79)
Correct Answer:
D
The angle which the line of nosing of the stair makes with the horizontal, is called
Free
(Multiple Choice)
4.9/5
(68)
Correct Answer:
D
The coefficient of friction between the concrete and soil is
(Multiple Choice)
4.8/5
(93)
A type of bond in a brick masonry consisting of alternate course of headers and stretchers, is called
(Multiple Choice)
4.7/5
(92)
In a sloping roof, the inclined wooden members laid from the ridge to the caves are known as
(Multiple Choice)
4.9/5
(87)
In rough brick arches, the joints at the extrados are wider than those at the intrados.
(True/False)
4.7/5
(80)
Pile foundations are used where the good bearing capacity is available near the ground.
(True/False)
4.8/5
(78)
A horizontal member of a frame employed to sub-divide a window opening horizontally is called
(Multiple Choice)
4.8/5
(68)
The brick laid with its length parallel to the face of the wall is called a
(Multiple Choice)
4.9/5
(69)
In constructing concrete partition wall, the concrete mixture usually adopted is
(Multiple Choice)
4.9/5
(76)
Weep holes are provided in the retaining walls to drain off the water from the filling behind.
(True/False)
4.8/5
(85)
The damp-proof course for the two leaves of the cavity wall is laid separately although at the same level.
(True/False)
4.8/5
(97)
Showing 1 - 20 of 24
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)