Exam 8: Construction Terminology and Techniques

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A bond consisting of heading and stretching courses so arranged that one heading course comes after several stretching courses, is called

Free
(Multiple Choice)
4.9/5
(57)
Correct Answer:
Verified

C

The minimum depth of foundation for buildings on clays is

Free
(Multiple Choice)
4.9/5
(79)
Correct Answer:
Verified

D

The angle which the line of nosing of the stair makes with the horizontal, is called

Free
(Multiple Choice)
4.9/5
(68)
Correct Answer:
Verified

D

The coefficient of friction between the concrete and soil is

(Multiple Choice)
4.8/5
(93)

The length of pre-cast concrete piles varies from

(Multiple Choice)
4.7/5
(76)

A type of bond in a brick masonry consisting of alternate course of headers and stretchers, is called

(Multiple Choice)
4.7/5
(92)

In a sloping roof, the inclined wooden members laid from the ridge to the caves are known as

(Multiple Choice)
4.9/5
(87)

In rough brick arches, the joints at the extrados are wider than those at the intrados.

(True/False)
4.7/5
(80)

Pile foundations are used where the good bearing capacity is available near the ground.

(True/False)
4.8/5
(78)

The inner surface of an arch is called

(Multiple Choice)
4.8/5
(69)

In a queen post truss,

(Multiple Choice)
4.9/5
(78)

A horizontal member of a frame employed to sub-divide a window opening horizontally is called

(Multiple Choice)
4.8/5
(68)

Which of the following statement is wrong?

(Multiple Choice)
4.8/5
(72)

Hearting is the portion of a

(Multiple Choice)
4.8/5
(70)

The brick laid with its length parallel to the face of the wall is called a

(Multiple Choice)
4.9/5
(69)

In constructing concrete partition wall, the concrete mixture usually adopted is

(Multiple Choice)
4.9/5
(76)

In a raking bond,

(Multiple Choice)
4.8/5
(82)

Weep holes are provided in the retaining walls to drain off the water from the filling behind.

(True/False)
4.8/5
(85)

The damp-proof course for the two leaves of the cavity wall is laid separately although at the same level.

(True/False)
4.8/5
(97)

Which of the following statement is correct?

(Multiple Choice)
4.8/5
(75)
Showing 1 - 20 of 24
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)