Exam 2: Various Aspects of Road Design and Planning
Exam 1: Road Design and Safety Standards: Camber, Slope, Width, and Distance Requirements25 Questions
Exam 2: Various Aspects of Road Design and Planning25 Questions
Exam 3: Traffic Engineering and Road Design24 Questions
Exam 4: Traffic Volume Studies and Analysis11 Questions
Select questions type
Which type of roads can be utilized during monsoon?
Free
(Multiple Choice)
4.9/5
(99)
Correct Answer:
D
The Nagpur plan conference was held in which year?
Free
(Multiple Choice)
4.8/5
(85)
Correct Answer:
C
If the speed of overtaken vehicle is 50kmph then spacing of vehicles is ___________
Free
(Multiple Choice)
4.7/5
(80)
Correct Answer:
D
The 'rural road development plan: Vision 2025' aims to provide basic access to villages in how many phases?
(Multiple Choice)
4.8/5
(70)
The phases of highway planning do not include the following?
(Multiple Choice)
4.8/5
(72)
The height of the driver above the road level is assumed as ___________
(Multiple Choice)
5.0/5
(84)
The maximum number of cities and towns are connected by which type of highway?
(Multiple Choice)
4.9/5
(84)
The reaction time of a driver assumed in OSD is ___________
(Multiple Choice)
4.7/5
(93)
The total area of a state is 2500km. Calculate the length of MDR.
(Multiple Choice)
4.8/5
(88)
During the development of the roads maximum priority is given to which type of road?
(Multiple Choice)
4.9/5
(75)
The total length of the first category roads was calculated by adding up the sum of __________
(Multiple Choice)
4.8/5
(84)
The arterial roads are a classification of which type of roads?
(Multiple Choice)
4.8/5
(87)
As per the Nagpur plan, the un-surfaced roads were meant for _____________
(Multiple Choice)
4.8/5
(90)
What was the development allowance assumed in the Nagpur plan?
(Multiple Choice)
4.8/5
(80)
Showing 1 - 20 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)