Exam 1: Interior Design
Exam 1: Interior Design191 Questions
Select questions type
A common problem in masonry walls is efflorescence. Which of the following condition/conditions must be present for efflorescence to occur?
A.presence of salt in the wall
B.extremely low humidity
C.exposure to water
D.contact of water with salt
(Multiple Choice)
4.9/5
(64)
The new office complex had their renovations just over a year before. They have recently moved desks around to accommodate new workers. They have now discovered the carpeting has greatly faded near the windows. When the carpet was specified the design firm didn't bother to look at the Fade Resistance Test. The Design firm should have required that tests be performed to determine colorfastness under certain conditions. Choose one of those conditions below that should have been done to have prevented this problem.
(Multiple Choice)
4.8/5
(72)
You are designing a commercial bathroom with three stalls of wall-mounted toilets. According to the latest ADA standards, at least one of the stalls must have a minimum depth of __ inches of inside clearance.
(Multiple Choice)
4.9/5
(67)
What type of bathroom sink is best for barrier free design?
(Multiple Choice)
5.0/5
(78)
What is the recommended grab bar height to meet ADA standards when mounted in a horizontal position?
(Multiple Choice)
4.7/5
(81)
The new clothing store wants to make sure their lighting is humanizing. What is meant by humanizing light?
(Multiple Choice)
4.8/5
(75)
The design firm is remodeling a well-known Italian restaurant in town. What type of resilient flooring would be the best choice for a commercial kitchen?
(Multiple Choice)
4.8/5
(67)
The Design Firm is redecorating the Day Care Center. They want to make sure the correct window coverings are specified to protect the children. Which of the following selections is the best choice for the space if the windows are 36 inches wide, 36 inches high, and 36 inches off the finished floor?
(Multiple Choice)
4.7/5
(69)
When a design firm has a project that their company has designed, who is responsible for the scheduling of the construction?
(Multiple Choice)
4.8/5
(66)
Often times plumbing or wiring or different types of tubing may need to go through framing joists.What is the rule for determining the largest side of hole, notch or cut in a joist? No hole should be more than ___ of Joist Depth
(Multiple Choice)
4.9/5
(75)
What is the name of the federal act that sets the safety standard for construction projects?
(Multiple Choice)
4.8/5
(66)
The design firm specifications have a splush finish for the carpeting for a new home. What is a splush finish?
(Multiple Choice)
4.8/5
(86)
The placing of elements that block direct line-of-sight travel paths for sound waves is called?
(Multiple Choice)
4.8/5
(74)
Where is the best location for a "panic switch" to turn on the exterior lights in a home?
(Multiple Choice)
4.8/5
(76)
Which of the following are major problems that can result from improper carpet cleaning?
(Multiple Choice)
5.0/5
(97)
The design firm has specified running trim which will be custom fabricated. What would this type of trim be specified for?
(Multiple Choice)
4.7/5
(81)
The formula for estimating the quantity of wallpaper material needed for a given project is based on?
(Multiple Choice)
4.8/5
(78)
The form identifying deficiencies to be corrected by the contractor is called the __________. This form is normally handled towards the end of the project.
(Multiple Choice)
4.8/5
(65)
Showing 101 - 120 of 191