Exam 12: Information System Development

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

System development cycles often group many activities into larger categories called ____________________.

Free
(Short Answer)
4.9/5
(70)
Correct Answer:
Verified

phases

  Figure 12-3 In a diagram like the one in Figure 12-3, a(n) ____ is a user or other entity such as application software. Figure 12-3 In a diagram like the one in Figure 12-3, a(n) ____ is a user or other entity such as application software.

Free
(Multiple Choice)
4.9/5
(68)
Correct Answer:
Verified

D

Project leaders can use ____________________ such as Microsoft Project to assist them in planning, scheduling, and controlling development projects.

Free
(Short Answer)
4.7/5
(86)
Correct Answer:
Verified

project management software

  Figure 12-3 As shown in Figure 12-3, a(n) ____ diagram graphically shows how actors interact with an information system. Figure 12-3 As shown in Figure 12-3, a(n) ____ diagram graphically shows how actors interact with an information system.

(Multiple Choice)
4.9/5
(69)

On a data flow diagram, a ____ is drawn as a circle.

(Multiple Choice)
4.8/5
(93)

An important responsibility of a CSO is to develop a computer security plan.

(True/False)
4.9/5
(80)

The advantage of custom software is that it ____.

(Multiple Choice)
4.9/5
(84)

The system development cycle should group activities or tasks into phases.

(True/False)
4.7/5
(89)

The ____________________ is a set of activities developers use to build an information system.

(Short Answer)
4.9/5
(92)

  Figure 12-1 In a diagram such as the one shown in Figure 12-1, each class can have one or more lower levels called ____. Figure 12-1 In a diagram such as the one shown in Figure 12-1, each class can have one or more lower levels called ____.

(Multiple Choice)
4.8/5
(77)

Technical feasibility addresses funding.

(True/False)
4.8/5
(83)

The systems analyst may skip many of the activities in a detailed design when developing custom software.

(True/False)
4.9/5
(77)

Each data item has an entry in the data dictionary section of the project dictionary.

(True/False)
4.8/5
(87)

The ____ becomes the first item in the project notebook.

(Multiple Choice)
4.9/5
(66)

A(n) ____________________ is responsible for designing and developing an information system.

(Short Answer)
4.8/5
(77)

A popular methodology on the market today that uses UML is the ____ by Grady Booch, Ivar Jacobsen, and James Rumbaugh.

(Multiple Choice)
5.0/5
(74)

The squares on a data flow diagram are ____.

(Multiple Choice)
4.8/5
(81)

  Figure 12-5 As shown in Figure 12-5, a(n) ____ is a lengthy, structured, group meeting in which users and IT professionals work together to design or develop an application. Figure 12-5 As shown in Figure 12-5, a(n) ____ is a lengthy, structured, group meeting in which users and IT professionals work together to design or develop an application.

(Multiple Choice)
4.9/5
(72)

To be an authorized VAR, few manufacturers have any requirements that a VAR must meet.

(True/False)
4.9/5
(80)

Every entity on the ERD has an entry in the project dictionary .

(True/False)
4.7/5
(80)
Showing 1 - 20 of 191
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)