The National Pollutant Discharge Elimination System may require that discharge permits be obtained from:

Free
(Multiple Choice)
5.0/5
(81)
Correct Answer:
Verified

D

A nonpoint source is land use that causes pollution.

Free
(True/False)
4.8/5
(70)
Correct Answer:
Verified

True

a. Is strict liability a legal concept available for environmental lawsuits? Why or why not? b. If strict liability is a concept used in environmental cases, what are the elements that the plaintiff must prove?

Free
(Essay)
4.7/5
(87)
Correct Answer:
Verified

a. Strict liability is a type of tort liability not based on fault. In the environmental area, persons may be involved in abnormally dangerous activities for which the court may hold them liable should damage to others occur.
b. The elements of strict liability that the plaintiff must establish are:
(a) The defendant is involved in an unduly dangerous activity.
(b) That the location of the activity is inappropriate.
(c) That the plaintiff has suffered damage because of this activity.

Which of the following is true about the regulation of pesticide use by the EPA?

(Multiple Choice)
4.7/5
(81)

Petrol Corp. owns several drilling operations in the Gulf of Mexico, refineries, service stations, and tanker trucks for transporting their products. Petrol Corp. hires an environmental manager to keep the company in compliance with various environmental laws. What laws will the environmental manager need to study and why?

(Essay)
4.8/5
(79)

NEPA requires that the EIS contain:

(Multiple Choice)
4.9/5
(93)

There is currently a law promoting the purchase, development, and use of industrially polluted property.

(True/False)
4.9/5
(74)

The CEQ requires that federal agencies make environmental assessments that are major, lengthy studies of potential environmental destruction.

(True/False)
4.9/5
(89)

For an activity to be treated as a public nuisance there must be some interference with the health, safety, or comfort of the public.

(True/False)
4.8/5
(70)

The United States Congress overwhelmingly ratified the Kyoto Protocol relating to multi-national reduction of greenhouse gases.

(True/False)
5.0/5
(84)

If, after making an environmental assessment, a federal agency decides no EIS is required, it must make this decision available to the public.

(True/False)
4.9/5
(86)

Which of the following is true of PSD areas under the Clean Air Act?

(Multiple Choice)
4.8/5
(78)

The Clean Air Act requires that the standard of performance for new stationary sources that are constructed or modified after the publication of regulations reflect emissions achievable through application of the best available technological system of continuous emission reduction.

(True/False)
4.8/5
(69)

The 1990 Clean Air Act Amendments provide that EPA must establish new NAAQS for major pollutants every five years.

(True/False)
5.0/5
(87)

R-T, Inc. must notify the EPA before it manufactures a new chemical, and the EPA administrator may limit or prohibit the chemical's manufacture or distribution.

(True/False)
4.9/5
(74)

CERCLA is an act that:

(Multiple Choice)
4.8/5
(68)

If the EPA determines that an SIP is not complete, the EPA must treat it as a nullity in whole.

(True/False)
4.9/5
(68)

The Council on Environmental Quality is a four-member advisory group to the EPA.

(True/False)
4.8/5
(73)

The CERCLA trust fund is financed by a:

(Multiple Choice)
4.8/5
(82)

NEPA imposes the responsibility for maintaining the environment on all federal agencies.

(True/False)
4.9/5