Exam 20: Value at Risk

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is true when lambda equals 0.95?

Free
(Multiple Choice)
4.8/5
(84)
Correct Answer:
Verified

D

An investor has $2,000 invested in stock A and $5,000 in stock B.The daily volatilities of A and B are 1.5% and 1% respectively and the coefficient of correlation is 0.8.What is the one day 99% VaR? (Note that N(-2.33)=0.01)

Free
(Multiple Choice)
4.8/5
(73)
Correct Answer:
Verified

A

Which of the following is true of a covariance matrix?

Free
(Multiple Choice)
4.8/5
(68)
Correct Answer:
Verified

A

Which of the following is true when delta,but not gamma,is used in calculating VaR for option positions?

(Multiple Choice)
4.8/5
(77)

Which was the minimum capital requirement for market risk in the 1996 BIS Amendment?

(Multiple Choice)
4.9/5
(78)

The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million. -What is the 99% value at risk?

(Multiple Choice)
4.8/5
(74)

What is the method of testing how often a VaR with a certain confidence level was exceeded in the past called?

(Multiple Choice)
4.8/5
(76)

At the end of Thursday,the estimated volatility of asset A is 2% per day.During Friday asset A produces a return of 3%.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the volatility of asset A at the end of Friday?

(Multiple Choice)
4.9/5
(76)

The 10-day VaR is often assumed to be which of the following?

(Multiple Choice)
4.7/5
(79)

What does EWMA stand for?

(Multiple Choice)
4.8/5
(81)

At the end of Thursday,the estimated volatility of asset B is 1% per day.During Friday asset B produces a return of zero.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the volatility of asset A at the end of Friday?

(Multiple Choice)
4.9/5
(79)

If the volatility for a portfolio is 20% per year,what is the volatility per quarter?

(Multiple Choice)
4.9/5
(75)

Which of the following is true?

(Multiple Choice)
4.9/5
(73)

Which of the following describes stressed VaR?

(Multiple Choice)
4.9/5
(76)

Which of the following is true?

(Multiple Choice)
4.9/5
(74)

Which of the following is true of the historical simulation method for calculating VaR?

(Multiple Choice)
4.7/5
(70)

At the end of Thursday,the estimated covariance between assets A and B is 0.0001.During Friday asset A produces a return of 3% and asset B produces a return of zero.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the covariance at the end of Friday?

(Multiple Choice)
4.9/5
(79)

Which of the following is true of the 99.9% value at risk?

(Multiple Choice)
4.9/5
(79)

The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million. -What is the 99% expected shortfall?

(Multiple Choice)
4.9/5
(63)

Which of the following is a definition of the covariance between X and Y?

(Multiple Choice)
4.8/5
(69)