Exam 2: Process Strategy and Analysis
Exam 1: Using Operations to Create Value115 Questions
Exam 2: Process Strategy and Analysis239 Questions
Exam 3: Quality and Performance198 Questions
Exam 4: Capacity Planning120 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems166 Questions
Exam 7: Project Management139 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management205 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning124 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration120 Questions
Exam 15: Supply Chain Sustainability78 Questions
Exam 16: Supplement A Decision Making107 Questions
Exam 17: Supplement J Operations Scheduling123 Questions
Exam 18: Supplement K Layout39 Questions
Exam 19: Supplement B Waiting Lines111 Questions
Exam 20: Supplement C Special Inventory Models53 Questions
Exam 21: Supplement D Linear Programming87 Questions
Exam 22: Supplement E Simulation54 Questions
Exam 23: Supplement F Financial Analysis55 Questions
Exam 24: Supplement G Acceptance Sampling Plans87 Questions
Exam 25: Supplement H Measuring Output Rates108 Questions
Exam 26: Supplement I Learning Curve Analysis50 Questions
Select questions type
Scenario 2.5
A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer. The engineer recorded ten observations and assigned the performance rating that is recorded in the bottom row of the table under the corresponding work element. All recorded times are in seconds.
-The allowance factor assigned is 20% for the data recorded. The rating factor for Element 1 is 10%, for Element 2 is 15%, and for Element 3 is 5%. What is the standard time for the three-element job?
(Essay)
4.8/5
(70)
An eighty percent learning curve means that for each doubling of output, the time required to complete the last task is ________ percent less than before.
(Short Answer)
4.7/5
(85)
Work sampling can be used to estimate the proportion of time spent by people or machines on activities.
(True/False)
5.0/5
(72)
A(n) ________ is a bar chart on which the factors are plotted in decreasing order of frequency along the horizontal axis.
(Short Answer)
4.9/5
(76)
A process chart activity that occurs when something is put away until a later time is a(n):
(Multiple Choice)
5.0/5
(75)
________ is represented in a process flow chart when an outgoing arrow from one step splits into two or more arrows that lead to different boxes.
(Short Answer)
4.8/5
(77)
An accounting firm realizes it is woefully inadequate at cultivating new clients. It is allowed to observe a law firm perform the new-client cultivation process in hopes of gleaning improved methods it can adopt. This is an example of:
(Multiple Choice)
4.8/5
(91)
Scenario 2.3
A job consists of three elements. Twenty observations for each element were timed, and the resulting data are shown in the following table. A performance rating has also been assigned for each element, as shown in the table. The job has an allowance of 15% of normal time.
-Use the information in Scenario 2.3. What is the normal time for job element #2?
(Multiple Choice)
4.7/5
(60)
Develop a process chart for one of the following:
1) Researching and writing a paper for your Operations Management class
2) Managing, developing and completing a team project for a Finance (or other) class
3) Planning for your job interview process as you approach graduation (including resume preparation, developing interview skills, researching company backgrounds, etc.)
4) Studying and developing a process improvement plan for a business or other process you are familiar with (e.g., fast food restaurant, obtaining tickets to a university-sponsored event, dry cleaners, book purchases for next term, and the like)
(Essay)
4.8/5
(77)
Benchmarking is a continuous, systematic procedure that measures a firm's products, services, and processes against those of industry leaders.
(True/False)
4.9/5
(84)
An interior designer decorates homes for a clientele that wants a one-of-a-kind living space. This service process can be described as:
(Multiple Choice)
4.8/5
(77)
Define economies of scope, and identify how they relate to flexible automation.
(Essay)
4.9/5
(83)
Scenario 2.1
Garman observes a worker assembling peanut valves and records the data displayed in the table.
-Use the information in Scenario 2.1 to answer this question. What is the average time for this job element?
(Multiple Choice)
4.8/5
(73)
________ is the process of creating labor standards based on the judgment of skilled observers.
(Short Answer)
4.8/5
(76)
The degree of process divergence is what keeps a large batch process from being economically produced using a line process.
(True/False)
4.8/5
(82)
List and briefly define four different basic types of manufacturing processes.
(Essay)
4.8/5
(84)
A work sampling method is used to determine the proportion of the time a worker is idle. The following information was gathered on a random basis.
What is the proportion of idle time observed for this worker?
(Multiple Choice)
4.9/5
(72)
When using work sampling, the times of day when the analyst collects the sample data should be selected at random over the length of the study.
(True/False)
4.8/5