Exam 21: Industrial Process Piping

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

What type of check valve is used with a globe valve?

(Essay)
4.9/5
(86)

Describe the process and instrumentation diagram (P&ID) and give the difference between a P&ID and a PFD.

(Essay)
4.8/5
(77)

What designations do the ASTM and ASME use to classify pipe strength?

(Essay)
4.8/5
(95)

What type of pipe is one of the most corrosion proof?

(Essay)
4.8/5
(75)

List at least two items that are controlled by government regulations.

(Essay)
4.8/5
(81)

Briefly explain the reasons for drawing revisions.

(Essay)
4.8/5
(76)

When would a piping detail drawing be needed?

(Essay)
4.9/5
(91)

Describe piping specification.

(Essay)
4.8/5
(91)

What is placed between two orifice flanges, and what is its function?

(Essay)
4.7/5
(81)

Name the triangle that is normally placed with a revision note on the drawing.

(Essay)
4.9/5
(78)

How does butt welding differ from socket welding?

(Essay)
4.8/5
(82)

Describe the functions of the following pipe fittings: 1808 elbow, reducing tee, eccentric reducer, lateral, elbolet, union, and bushing.

(Essay)
4.7/5
(93)

Give the contents of a spool drawing.

(Essay)
4.9/5
(73)

On what type of pipe is solvent welding used?

(Essay)
4.7/5
(71)

Piping drawings are also referred to as general arrangement drawings (GA).

(Essay)
4.8/5
(83)

How is a drawing revision correlated with a revision document?

(Essay)
4.9/5
(67)

What are markups?

(Short Answer)
4.9/5
(72)

Give the outside diameter o Give the outside diameter o

(Essay)
4.8/5
(87)

What type of pipe is best used for hydraulic lines in automo- biles and aircraft?

(Essay)
4.8/5
(78)

What is the relationship between piping isometrics and pip- ing spool drawings?

(Essay)
4.8/5
(92)
Showing 21 - 40 of 50
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)