Exam 18: Statistical Applications in Quality Management
Exam 1: Defining and Collecting Data202 Questions
Exam 2: Organizing and Visualizing256 Questions
Exam 3: Numerical Descriptive Measures217 Questions
Exam 4: Basic Probability167 Questions
Exam 5: Discrete Probability Distributions165 Questions
Exam 6: The Normal Distribution and Other Continuous Distributions170 Questions
Exam 7: Sampling Distributions165 Questions
Exam 8: Confidence Interval Estimation219 Questions
Exam 9: Fundamentals of Hypothesis Testing: One-Sample Tests194 Questions
Exam 10: Two-Sample Tests240 Questions
Exam 11: Analysis of Variance170 Questions
Exam 12: Chi-Square and Nonparametric188 Questions
Exam 13: Simple Linear Regression243 Questions
Exam 14: Introduction to Multiple394 Questions
Exam 15: Multiple Regression146 Questions
Exam 16: Time-Series Forecasting235 Questions
Exam 17: Getting Ready to Analyze Data386 Questions
Exam 18: Statistical Applications in Quality Management159 Questions
Exam 19: Decision Making126 Questions
Exam 20: Probability and Combinatorics421 Questions
Select questions type
Larger indicates larger capability of meeting the requirements.
(True/False)
4.9/5
(79)
TPM establishes ways to clean and maintain the necessary housekeeping aspects
of a work environment.
(True/False)
4.7/5
(78)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, what percentage of the chips will fall below the upper specification
limit?
(Short Answer)
4.8/5
(77)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, based on the chart for the number of blemishes, it
appears that the process is out of control.
(True/False)
4.8/5
(75)
SCENARIO 18-4
A factory supervisor is concerned that the time it takes workers to complete an important production
task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor
proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and
range for each hour are listed below. 1 18.4 25 2 16.9 27 3 23.0 30 4 21.2 23 5 21.0 24 6 24.0 25 7 19.3 12 8 15.8 14 9 20.0 13 10 23.0 11 She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to Scenario 18-4, suppose the supervisor constructs an R chart to see if the variability in collection times is in-control. What is the center line of this R chart?
(Multiple Choice)
4.9/5
(92)
SCENARIO 18-3
A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a
batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods
each day for 14 days and records the sample mean and range for each day. 1 58.5 5.1 2 47.6 7.8 3 64.3 6.1 4 60.6 5.7 5 63.7 6.2 6 57.5 6.0 7 55.0 5.4 8 54.9 6.1 9 55.0 5.9 10 62.7 5.0 11 61.9 7.1 12 60.0 6.5 13 58.3 5.9 14 52.0 5.2
-Referring to Scenario 18-3, suppose the analyst constructs an R chart to see if the variability in production times is in-control. What is the upper control limit for this R chart?
(Multiple Choice)
4.9/5
(79)
SCENARIO 18-8
Recently, a university switched to a new type of computer-based registration. The registrar is
concerned with the amount of time students are spending on the computer registering under the new
system. She decides to randomly select 8 students on each of the 12 days of the registration and
determine the time each spends on the computer registering. The range, mean, and standard deviation
of the times required to register are in the table that follows. Range 1 10 5.250 3.4949 2 31 15.250 10.3060 3 13 20.375 4.9262 4 21 22.875 8.3911 5 35 8.500 11.3767 6 18 7.875 6.9372 7 25 11.250 8.5815 8 30 7.875 9.5235 9 17 10.250 6.3640 10 22 9.500 7.8740 11 27 7.875 8.7086 12 26 12.875 9.3723
-Referring to Scenario 18-8, an R chart is to be constructed for the time required to register. The
center line of this R chart is located at __________.
(Short Answer)
4.8/5
(72)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, an R chart is to be constructed for the number of blemishes. One way
to create the upper control limit involves multiplying the mean of the sample ranges by D4. For
this data set, the value of D4 is ________.
(Short Answer)
4.8/5
(86)
SCENARIO 18-8
Recently, a university switched to a new type of computer-based registration. The registrar is
concerned with the amount of time students are spending on the computer registering under the new
system. She decides to randomly select 8 students on each of the 12 days of the registration and
determine the time each spends on the computer registering. The range, mean, and standard deviation
of the times required to register are in the table that follows. Range 1 10 5.250 3.4949 2 31 15.250 10.3060 3 13 20.375 4.9262 4 21 22.875 8.3911 5 35 8.500 11.3767 6 18 7.875 6.9372 7 25 11.250 8.5815 8 30 7.875 9.5235 9 17 10.250 6.3640 10 22 9.500 7.8740 11 27 7.875 8.7086 12 26 12.875 9.3723
-Referring to Scenario 18-8, an R chart is to be constructed for the time required to register. One
way to create the upper control limit involves multiplying the mean of the sample ranges by .
For this data set, the value of is ________.
(Short Answer)
4.7/5
(88)
SCENARIO 18-3
A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a
batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods
each day for 14 days and records the sample mean and range for each day. 1 58.5 5.1 2 47.6 7.8 3 64.3 6.1 4 60.6 5.7 5 63.7 6.2 6 57.5 6.0 7 55.0 5.4 8 54.9 6.1 9 55.0 5.9 10 62.7 5.0 11 61.9 7.1 12 60.0 6.5 13 58.3 5.9 14 52.0 5.2
-Referring to Scenario 18-3, suppose the sample mean and range data were based on 11 observations per day instead of 10. How would this change affect the lower and upper control
Limits of the R chart?
(Multiple Choice)
4.8/5
(89)
SCENARIO 18-3
A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a
batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods
each day for 14 days and records the sample mean and range for each day. 1 58.5 5.1 2 47.6 7.8 3 64.3 6.1 4 60.6 5.7 5 63.7 6.2 6 57.5 6.0 7 55.0 5.4 8 54.9 6.1 9 55.0 5.9 10 62.7 5.0 11 61.9 7.1 12 60.0 6.5 13 58.3 5.9 14 52.0 5.2
-Referring to Scenario 18-3, suppose the analyst constructs an R chart to see if the variability in production times is in-control. What is the center line of this R chart?
(Multiple Choice)
4.7/5
(78)
SCENARIO 18-2
A political pollster randomly selects a sample of 100 voters each day for 8 successive days and asks
how many will vote for the incumbent. The pollster wishes to construct a p chart to see if the
percentage favoring the incumbent candidate is too erratic. Sample Number Favoring 1 57 2 57 3 53 4 51 5 55 6 60 7 56 8 59
-Referring to Scenario 18-2, what is the numerical value of the lower control limit for the p chart?
(Multiple Choice)
4.9/5
(90)
SCENARIO 18-5
A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of
disks with bad sectors was determined for each of these samples. The results are in the table that
follows. 1 9 0.037500 2 7 0.029167 3 4 0.016667 4 6 0.025000 5 8 0.033333 6 3 0.012500 7 6 0.025000 8 10 0.041667 9 16 0.06667 10 24 0.100000 11 15 0.062500 12 9 0.037500 13 4 0.016667 14 8 0.033333 15 6 0.025000
-Referring to Scenario 18-5, a p control chart is to be made for these data. The estimate of the
standard error of the proportion of disks with bad sectors is __________.
(Short Answer)
5.0/5
(79)
SCENARIO 18-9
The manufacturer of canned food constructed control charts and analyzed several quality
characteristics. One characteristic of interest is the weight of the filled cans. The lower specification
limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five
cans tested every fifteen minutes during a day's production. Number XBar Range Number XBar Range 1 3.05072 0.0215 16 3.04646 0.073 2 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 18 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 20 3.05078 0.0215 6 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 22 3.05348 0.0581 8 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 10 3.02034 0.0538 25 3.0516 0.0641 11 3.03764 0.0584 26 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 28 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601
-Referring to Scenario 18-9, an chart is to be used for the weight. One way to obtain the
control limits is to take the grand mean and add and subtract the product of A2 times the mean of
the sample ranges. For this data set, the value of A2 is ________.
(Short Answer)
4.8/5
(86)
Maintaining the gains that have been made with a revised process in the long term by avoiding potential problems that can occur when a process is changed involves which part of the DMAIC
Process?
(Multiple Choice)
4.8/5
(79)
Which of the following is not part of the DMAIC process in Six Sigma management?
(Multiple Choice)
4.7/5
(88)
It is not possible for the chart to be out-of-control when the R chart is in control.
(True/False)
4.8/5
(70)
TPM establishes ways to eliminate unnecessary housekeeping aspects of a work
environment.
(True/False)
4.9/5
(77)
SCENARIO 18-9
The manufacturer of canned food constructed control charts and analyzed several quality
characteristics. One characteristic of interest is the weight of the filled cans. The lower specification
limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five
cans tested every fifteen minutes during a day's production. Number XBar Range Number XBar Range 1 3.05072 0.0215 16 3.04646 0.073 2 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 18 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 20 3.05078 0.0215 6 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 22 3.05348 0.0581 8 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 10 3.02034 0.0538 25 3.0516 0.0641 11 3.03764 0.0584 26 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 28 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601
-Referring to Scenario 18-9, estimate the percentage of the cans whose weight is inside the
specification limit.
(Short Answer)
4.9/5
(84)
Common causes of variation represent variation due to the inherent variability in
the system.
(True/False)
4.8/5
(93)
Showing 121 - 140 of 159
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)