Exam 10: Budgetary Control and Responsibility Accounting

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following are financial measures of performance? 1. Controllable margin 2. Product quality 3. Labor productivity

(Multiple Choice)
4.7/5
(77)

A static budget report is appropriate for

(Multiple Choice)
4.9/5
(78)

Policies regarding when a difference between actual and planned results should be investigated are generally more restrictive for noncontrollable items than for controllable items.

(True/False)
4.8/5
(76)

If an investment center has a $90,000 controllable margin and $1,200,000 of sales, what average operating assets are needed to have a return on investment of 10%?

(Multiple Choice)
4.9/5
(89)

Residual income and ROI are used as performance evaluation methods for profit center performance

(True/False)
4.9/5
(89)

A static budget is appropriate in evaluating a manager's performance if

(Multiple Choice)
4.8/5
(72)

Best Shingle's budgeted manufacturing costs for 50,000 squares of shingles are: Fixed manufacturing costs $12,000\quad\quad\$ 12,000 Variable manufacturing costs $16.00\quad\$ 16.00 per square Best produced 40,000 squares of shingles during March. How much are budgeted total manufacturing costs in March?

(Multiple Choice)
4.9/5
(74)

What budgeted amounts appear on the flexible budget?

(Multiple Choice)
4.9/5
(79)

A profit center is

(Multiple Choice)
4.9/5
(63)

In computing ROI, land held for future use

(Multiple Choice)
4.9/5
(99)

At zero direct labor hours in a flexible budget graph, the total budgeted cost line intersects the vertical axis at $30,000. At 15,000 direct labor hours, a horizontal line drawn from the total budgeted cost line intersects the vertical axis at $90,000. Fixed and variable costs may be expressed as:

(Multiple Choice)
4.8/5
(88)

A manager of a cost center is evaluated mainly on

(Multiple Choice)
4.9/5
(64)

An investment center generated a contribution margin of $400,000, fixed costs of $200,000 and sales of $2,000,000. The center's average operating assets were $800,000. How much is the return on investment?

(Multiple Choice)
4.9/5
(83)

Return on investment is calculated by dividing

(Multiple Choice)
4.8/5
(80)

Flexible budgets are widely used in production and service departments.

(True/False)
4.9/5
(81)

Management by exception

(Multiple Choice)
4.9/5
(89)

Which statement is true?

(Multiple Choice)
4.8/5
(86)

Assume that actual sales results exceed the planned results for the second quarter. This favorable difference is greater than the unfavorable difference reported for the first quarter sales. Which of the following statements about the sales budget report on June 30 is true?

(Multiple Choice)
4.9/5
(86)

Budget reports comparing actual results with planned objectives should be prepared only once a year.

(True/False)
4.9/5
(85)

The flexible budget report evaluates a manager's performance in two areas: (1) production and (2) costs.

(True/False)
4.8/5
(78)
Showing 81 - 100 of 159
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)