Exam 10: Program Design

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is a 'top-down approach' and why is it important when designing programs?

(Essay)
4.9/5
(91)

A control module can also be called a library module and is a set of reusable code.

(True/False)
4.9/5
(74)

Processes from logical DFDs might show up on a physical data flow diagram as:

(Multiple Choice)
4.7/5
(85)

In most automated cases,data stores from logical DFDs will be converted to:

(Multiple Choice)
4.8/5
(93)

A signal of poor cohesion could be the presence of control flags that are passed down to subordinate modules

(True/False)
4.9/5
(72)

A structure chart is composed of modules that work together to form a program.

(True/False)
4.9/5
(74)

When putting individual components together for a structure chart you will need to identify the three basic kinds of processes in a process model.Identify these three kinds of models and describe each.

(Essay)
4.7/5
(75)

A good indication of needing a transaction structure on a structure chart occurs when a DFD shows a single data flow entering a process that produces multiple data flows as outputs.

(True/False)
4.8/5
(94)

As a structure chart is constructed,it is generally best to build modules with:

(Multiple Choice)
4.8/5
(84)

In a structure chart,the purpose of a control couple is to:

(Multiple Choice)
4.9/5
(89)

What is the difference between transaction structures and transform structures on a structure chart?

(Essay)
4.7/5
(72)

An effective process is an output process on a structure chart.

(True/False)
4.9/5
(71)

When building the physical data flow diagram,processes may become html web pages or Visual Basic screens.

(True/False)
4.8/5
(87)

The fifth step in creating a Physical Data Flow Diagram is

(Multiple Choice)
4.9/5
(75)

When changing a logical DFD into a physical DFD,it might be necessary to ________.

(Multiple Choice)
4.9/5
(83)

A structure chart shows sequence,selection and data flows.

(True/False)
4.8/5
(93)

The fourth step in creating a Physical Data Flow Diagram is

(Multiple Choice)
4.7/5
(85)

Because project teams rely more on packaged software,program design is no longer needed.

(True/False)
4.9/5
(74)

By definition,external entities on the DFD:

(Multiple Choice)
4.8/5
(84)

Pseudocode is:

(Multiple Choice)
4.8/5
(80)
Showing 21 - 40 of 68
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)