Exam 6: Quality and Process Improvement
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
A control chart is a time-ordered diagram that is used to determine whether observed variations are abnormal.
(True/False)
4.8/5
(82)
The upper and lower specification limits for a component are 5.20,and 5.30 ounces,respectively.The process standard deviation is .05,and the process average is 5.24 ounces.Is this process capable?
(Essay)
4.9/5
(68)
________ teams address issues of paramount concern to management,labor,or both.
(Short Answer)
4.8/5
(79)
A measure of the dispersion of observations in a process distribution is called a(n)
(Multiple Choice)
4.8/5
(83)
A telephone customer service center has experienced several problems.They have begun to analyze the data from customer complaints.Their first step was to construct the table below.
\ Problem Type Total Person not available 5 Incorrect information given 12 Phone line busy 7 Long delay 39 Phone tree confusing 20 People friendly 17
Use this data to build a Pareto chart to help identify the "vital few" problems.
(Essay)
4.8/5
(90)
________ of variation include any variation-causing factors that can be identified and eliminated.
(Short Answer)
4.8/5
(78)
Which one of the following statements relating to quality is TRUE?
(Multiple Choice)
4.9/5
(93)
Common causes of variation are the purely random,unidentifiable sources of variation that are unavoidable with the current process.
(True/False)
4.8/5
(75)
A hotel tracks the number of complaints per month.When the process is in control,there is an average of 35 complaints per month.Assume that a 2-sigma control limit is used.The next four months have 33,27,29,and 43 complaints.What should management do?
(Multiple Choice)
4.8/5
(71)
Process capability measures the ability of the process to meet the ________ for a product or service.
(Essay)
4.7/5
(84)
A product has five major components with individual reliabilities of 0.95,0.98,0.97,0.98,and 0.99.What is the reliability of the product?
(Multiple Choice)
4.8/5
(84)
The most thorough approach to inspection is to inspect each product or service at each stage of the process for quality; this is called ________.
(Short Answer)
5.0/5
(81)
The upper limit and lower specifications for a service are 5.0 min.and 3.0 min.,respectively.The process standard deviation is 0.4 min.and the process average is 4.0 min.What conclusion can be drawn?
(Multiple Choice)
4.8/5
(80)
Judging service quality on the basis of how a service provider is dressed and how courteous and friendly they are is considered
(Multiple Choice)
4.7/5
(85)
Purely random,unidentifiable sources of variation that are unavoidable with an existing process make it impossible to apply statistical process control techniques.
(True/False)
4.8/5
(83)
Self-managed teams essentially change the way work is organized because employees have control over their jobs.
(True/False)
4.7/5
(70)
Continuous improvement is based on the Japanese concept called Kaizen.
(True/False)
4.7/5
(77)
One part of the sampling plan specifies the time between successive samples.
(True/False)
4.8/5
(84)
Table 6.1
Factors for Calculating Three-Sigma Limits for the -chart and R-chart
Size of Sample (n) Factor for UCL and LCL for X - Charts Factor for LCL for R - Charts Factor for UCL for R - Charts 2 1.880 0 3.267 3 1.023 0 2.575 4 0.729 0 2.282 5 0.577 0 2.115 6 0.483 0 2.004 7 0.419 0.076 1.924 8 0.373 0.136 1.864 9 0.397 0.184 1.816 10 0.308 0.233 1.777
Source: 1950 Manual on Quality Control of Materials, copyright
American Society for Testing Materials. Reprinted with permission.
-Historically,the average diameter of the holes drilled has been 0.25 cm and the average range has been 0.1 cm.Determine the central line and upper and lower control limits for an - and an R-chart,assuming samples of size 8 will be taken.Use Table 6.1.For the -chart,what is the value of the LCL ?
(Multiple Choice)
4.8/5
(84)