Exam 4: Capacity

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A company's production facility,consisting of two identical machines,currently caters only to product A.The annual demand for the product is 4000 units.Management has now decided to introduce another product,B,which uses the same facilities as that of product A.Product B has an annual demand of 2000 units.In view of the uncertainties involved in producing two products,management desires to have an overall 10 percent capacity cushion.Given the following additional information,how many more machines are required? (Assume 8 hours/shift,2 shifts/day,250 days/year,and that no overtime is allowed.) Product Processing Time per Unit (in hours) Setup Time per Batch (in hours) Batch Size (units) A 2.0 8 100 B 2.8 16 200

(Multiple Choice)
4.9/5
(70)

The Northern Manufacturing Company is producing two types of products: A and B.Demand forecasts for next year and other production-related information are provided in the following table: Product A Product B Demand forecast (units/yr) 4000 12000 Batd size (units/batch) 80 150 Standard processing time (hr/unit) 2.5 2.0 Standard setup time (hr/batch 18 24 Both of these products are produced at the same workstation,called the Automatic Lathe.Currently,the company has 12 automatic lathes,and financial constraints prevent any expansion for the next year.It works 250 days per year with two 8-hour shifts and desires a 25 percent capacity cushion.Which one of the following alternatives will allow next year's demand to be fully covered?

(Multiple Choice)
4.8/5
(79)

________ capacity is the maximum output that a process or firm can economically sustain under normal conditions.

(Short Answer)
4.8/5
(80)

Provided each measure is expressed in the appropriate units,Little's Law provides a mathematical expression that states capacity utilization equals the ratio of work-in-process inventory divided by the output rate of a process.

(True/False)
4.7/5
(68)

The lock box department at Bank 21 handles the processing of monthly loan payments to the bank,monthly and quarterly premium payments to a local insurance company,and bill payments for 85 of the bank's largest commercial customers.The payments are processed by machine operators,with one operator per machine.An operator can process one payment in 0.25 minute.Setup times are negligible in this situation.A capacity cushion of 20 percent is needed for the operation.The average monthly (not annual)volume of payments processed through the department currently is 400,000.However,it is expected to increase by 20 percent.The department operates eight hours per shift,two shifts per day,260 days per year.How many machines (not operators)are needed to satisfy the new total processing volume? (Round up to the next whole integer.)

(Multiple Choice)
4.7/5
(71)

In a manufacturing company,measuring capacity based on the number of machine-hours required to process a specific batch of production is an example of an output measure of capacity.

(True/False)
4.7/5
(82)

What is the meaning of diseconomies of scale,and what are two ways for a firm to avoid them?

(Essay)
4.8/5
(81)

The total time that a typical item spends in any process,termed ________ time,increases as the average level of inventor in that process increases.

(Short Answer)
4.8/5
(80)

If a system is well balanced,which one of the following changes usually calls for a larger-capacity cushion?

(Multiple Choice)
4.8/5
(79)

Capacity can be expressed by output or input measures.

(True/False)
4.7/5
(95)

The setup time required to switch from one product type to another within a manufacturing process is an example of an external,predictable from of variability.

(True/False)
4.7/5
(83)

The wait-and-see strategy refers to a condition which involves smaller,more frequent jumps.

(True/False)
4.7/5
(82)

A blocked operation is an operation that runs out of work to process.

(True/False)
4.9/5
(87)

If a system is well balanced,which one of the following changes usually calls for a smaller-capacity cushion?

(Multiple Choice)
4.7/5
(84)

The first step in the application of the Theory of Constraints (TOC)is to identify the bottlenecks.

(True/False)
4.9/5
(83)

Diseconomies of scale refers to situations where the average cost per unit decreases as the facility's size increases.

(True/False)
4.8/5
(73)

Explain the distinction between blocked and starved operations in a process that consists of sequential dependant operations.

(Essay)
4.9/5
(82)

Increasing the amount of work-in-process inventory reduces the likelihood that operations in the process will be starved.

(True/False)
4.8/5
(89)

Which of the following descriptions about waiting line models is best?

(Multiple Choice)
4.8/5
(73)

Two factors favor an expansionist strategy in capacity decisions: expansion may help achieve ________ of scale,and it may also ________ the learning rate.

(Short Answer)
4.8/5
(85)
Showing 41 - 60 of 145
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)