Exam 15: Work Measurement
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Which of the following is not an advantage of the predetermined-data approach to work measurement?
(Multiple Choice)
4.9/5
(73)
A work standard is the time required for a trained worker to perform a task following a prescribed method with normal effort and skill.
(True/False)
4.8/5
(89)
The methods time measurement system is a predetermined data system.
(True/False)
4.7/5
(86)
A worker was observed for four cycles in a repetitive task that contains four distinct elements. The observer recorded the following items in seconds, using the continuous method.
Element Cycle 1 Cycle 2 Cycle3 Cycle4 12 66 111 168 21 75 122 185 37 86 133 200 53 89 146 209
-Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.2 and all other elements receive a rating of 1.1.If work element 2 is performed every other cycle but every other element is performed every cycle,and the company has an allowance time of 0.10,what is the standard time for the complete cycle?
(Multiple Choice)
4.9/5
(85)
Work measurement is the process of creating labor standards based on the judgment of skilled observers.
(True/False)
4.9/5
(92)
Traditional work measurement techniques often are viewed as repressive.
(True/False)
4.7/5
(63)
A time-study analyst has found the select time for a work element to be 14.0 minutes,with a sample standard deviation of 3.2 minutes.What is the minimum sample size needed if the estimate is to be within 4 percent of the average 95 percent of the time?
(Multiple Choice)
4.9/5
(78)
Which one of the following statements about the time-study method is TRUE?
(Multiple Choice)
4.7/5
(84)
Are time standards more useful for manufacturing or service processes? Why?
(Essay)
4.8/5
(90)
Elemental standard time data can help managers develop time standards for new work before production begins.
(True/False)
4.9/5
(63)
The most commonly used method for setting a time standard is called a(n)________.
(Short Answer)
4.8/5
(84)
The snap-back method of time study resets the stopwatch to zero on the completion of each work element.
(True/False)
4.8/5
(94)
An industrial engineer is conducting a time study for a work element.The select time is 7.5 minutes,and the sample standard deviation of the observed time is one minute.What is the appropriate sample size if the estimate is to be 3 percent of the true average time 95 percent of the time?
(Multiple Choice)
4.8/5
(78)
A worker was observed for four cycles in a repetitive task. The observer recorded the following times, in seconds, using the continuous method. The ratings for each element and frequency it is performed are also indicated in the table. The allowance fraction is 20 percent.
Element Cycle 1 Cycle 2 Cycle 3 Cycle 4 Rating Frequency 15 106 208 309 1.10 1.0 37 131 234 334 1.05 0.5 47 143 245 348 1.20 0.5 90 190 293 392 1.15 1.0
-Use the information in Table H.3.What is the select time for work element 2?
(Multiple Choice)
4.9/5
(83)
During a time study,the following times were observed for a particular job using the continuous (non-snapback)method: 22,51,72,98,128,and 150 seconds.There is only one element per cycle.The sample standard deviation of the observed times has already been computed as 3.9 seconds.If an estimate for the average time that is within 4 percent of the true long-range average 95 percent of the time is desired,how many additional observations are needed?
(Multiple Choice)
4.8/5
(86)
The performance-rating factor in a time study is a totally objective measure.