Question 16

Multiple Choice

Which of the following engineering controls would be best suited to strengthen a slope that has been over-steepened by cutting into the hillside during highway construction?


A) build a retaining wall
B) install rock bolts
C) cover the slope with vegetation
D) control the flow of water
E) build a tunnel