Multiple Choice
A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the standard time for this task if the employee worked at a 20 percent faster pace than average, and an allowance of 20s percent of job time is used?
A) 4.5 seconds
B) 5 seconds
C) 20 seconds
D) 28.8 seconds
E) 100 seconds
Correct Answer:

Verified
Correct Answer:
Verified