To facilitate utilization of bottleneck operations, in theory of constraints scheduling ________ can be split into __________ to reduce waiting times.
A) bottleneck lots; non bottleneck lots
B) transfer batches; process lots
C) sized lots; constrained lots
D) process batches; transfer batches
E) buffer lots; transfer lots