Multiple Choice
If an auditor calculated an upper limit rate of deviation of 5% when the tolerable rate of deviation was 4%,the auditor would conclude that:
A) The population deviation rate is low enough to rely on internal control as planned.
B) The population deviation rate may be higher than that necessary to rely on internal control as planned.
C) The control risk can be assessed at planned levels.
D) The control risk should be assessed at lower levels.
Correct Answer:

Verified
Correct Answer:
Verified
Q50: Assume that the audit team wishes to
Q51: In determining the number of documents to
Q52: Why does the risk of overreliance have
Q53: As a result of sampling procedures applied
Q54: To statistically evaluate an attributes sampling application,the
Q56: If the upper limit rate of deviation
Q57: Indicate how each of the following conditions
Q58: The auditor tested a sample of recorded
Q59: To ensure proper authorization of payroll
Q60: When the auditor concludes that a control