Multiple Choice
A unit that is rejected at a quality control inspection point,but that can be reworked and sold,is referred to as a
A) spoiled unit.
B) scrap unit.
C) abnormal unit.
D) defective unit.
Correct Answer:

Verified
Correct Answer: