Multiple Choice
In an assembly line following a lean philosophy,what would a worker do who found a quality problem?
A) Report the problem at the end of the shift
B) Report who made the mistake
C) Stop the line and fix the problem
D) Fix the problem personally at the end of the shift
E) Let the inspector fix the problem
Correct Answer: