Multiple Choice
For an attributes sampling plan, the tolerable deviation rate is 4%, the computed upper deviation rate is 7%, the sample deviation rate is 3%, and the risk of assessing control risk too low is 5%. Which of the following is true?
A) The auditor must increase control risk because the risk of assessing control risk too low is greater than the tolerable deviation rate.
B) The auditor is likely to increase control risk because the risk of assessing control risk too low is greater than the tolerable deviation rate.
C) The auditor must increase control risk because the computed upper deviation rate is greater than the tolerable deviation rate.
D) The auditor is likely to increase control risk because the computed upper deviation rate is greater than the tolerable deviation rate.
Correct Answer:

Verified
Correct Answer:
Verified
Q25: The risk of incorrect acceptance relates to
Q26: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6695/.jpg" alt=" Determine
Q27: Why must an auditor use sampling? What
Q28: An auditor is testing internal control procedures
Q29: The likelihood of assessing control risk too
Q31: An underlying feature of random-based selection of
Q32: Which of the following statements is correct
Q33: Attribute sampling is used to estimate the
Q34: Based on a 5% risk of assessing
Q35: Audit sampling is not used for which