Q12: Parts of a wall:<br>-B _ <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB9574/.jpg"
Q13: Material And Elevation Symbols<br>-_Insulation<br>A) <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB9574/.jpg" alt="Material
Q14: Parts of the roof:<br>-D_ <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB9574/.jpg" alt="Parts
Q15: Commercial plans illustrating light fixture locations may
Q16: The lever door hardware is required in
Q18: Identify the following cabinet construction. <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB9574/.jpg"
Q19: The critical path is<br>A) a timetable charting
Q20: Draw the following symbols:<br>-Toilet
Q21: Match the following:<br>-Casement<br>A) <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB9574/.jpg" alt="Match the
Q22: Drawings that illustrate walls are called<br>A) sections.<br>B)