Multiple Choice
In any construction project the material cost constitute about..... % of the total project cost.
A) 60
B) 25
C) 35
D) 45
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q1: The space between the walls and cement
Q2: Which one of the following is not
Q3: Supervisor is at the lowest level of
Q4: In one stack not more than.......... cement
Q6: A good safety record can produce higher
Q7: While placing of concrete, it should not
Q8: For work at height one should use<br>A)Safety
Q9: HRD stands for<br>A)Human resource development<br>B)Human resource design<br>C)Higher
Q10: Which of the following is not a
Q11: EOQ stands for<br>A)Equal order quantity<br>B)Economic order quantity<br>C)Extra