Multiple Choice
Define a Post Occupancy Evaluation (POE) :
A) It is typically conducted within the first three months for the contract to fix any problems that may arise after moving in.
B) Focuses only on the structure of a building and how it is settling and normally not the interior finishes.
C) It is the evaluation of the architect, designer, sub-contractors and contractor, on how the project performed.
D) Involves the evaluation of the opinions from the people that use the building and how well the building matches the user's needs. It identifies ways to improve performance and building design.
Correct Answer:

Verified
Correct Answer:
Verified
Q166: The number of exits required for a
Q167: Which of the following is the description
Q168: A client wants to use her 1"
Q169: A restaurant wants to have a buffet
Q170: Buildings and structures of Types 1 and
Q172: Moisture can travel upwards from lower layers
Q173: The barrier-free unobstructed wall space on the
Q174: The carpet manufacturer dyes its carpet after
Q175: The Designer for the Smiths new bathroom
Q176: Which of the following statements is not