Multiple Choice
A system administrator is tasked to setup a database server with failover clustering feature enabled. One of the requirements is to have one database running at all times with data being synchronized and replicated to the idle database in case the primary database server fails. Both servers will be monitored by a witness on a LUN. Which of the following cluster techniques should be implemented to meet these requirements?
A) Active/Active
B) Active/Passive
C) Single Local Quorum
D) Passive/Passive
E) Shared Multiple Quorum
Correct Answer:

Verified
Correct Answer:
Verified
Q478: A systems administrator wants to run a
Q479: A technician is connecting a server's secondary
Q480: A manager has noticed that the staff
Q481: A technician is installing a new blade
Q482: A systems administrator is preparing to install
Q484: An administrator is opening a firewall to
Q485: Joe, a system administrator, is replacing an
Q486: A server administrator recently upgraded a three-year-old
Q487: Which of the following is the MINIMUM
Q488: A technician needs to install more add-on