Multiple Choice
An architect is planning an HPE Moonshot System deployment. The architect plans to individually connect each iLO CM module to the management network. The customer informs the architect that this plan requires too many 1GbE ports per rack for the data center infrastructure. What is one way that the architect can alter the plan to meet the customer's needs, while still allowing iLO access to the HPE Moonshot Systems?
A) Configure iLO traffic to share the same adapters as production traffic. Configure VLANs on the HPE Moonshot switch modules to separate the two types of traffic.
B) Keep one iLO CM Management port connected to the network. Use the iLO CM link ports on each iLO CM module to daisy chain the chassis together.
C) Enable the iLO REST API on each cartridge node. The nodes will then accept iLO commands on the adapters that they use for production traffic.
D) Add a second switch module and uplink module to each chassis to connect to the cartridge iLO ports. Stack the modules in different chassis and connect just one to the management network.
Correct Answer:

Verified
Correct Answer:
Verified
Q9: A customer plans to use Insight Control
Q10: An architect proposes an HPE Moonshot server
Q11: A customer has a large Oracle-based ERP
Q12: How does the HPE c7000 BladeSystems use
Q13: An architect needs to design a solution
Q15: An architect needs to determine whether a
Q16: A customer has an HPE Integrity Superdome
Q17: An architect is designing an HPE Apollo
Q18: A customer is working on a project
Q19: During a data center transformation discussion, an