Multiple Choice
A Process is fed cases to work from a spreadsheet held in a shared drive. The location of the shared drive is different between Development and Production environments. How should this be managed?
A) During the build and test phase, hold the 'Development' path to the spreadsheet in a data item within a Process. When the Process is imported into Production it will be opened and the data item will be amended to hold the 'Production' path.
B) During the build and test phase, hold the 'Development' path to the spreadsheet in a data item within a Process. Expose this data item as a Session Variable. When the Process is run in Production, this Session Variable value can be set in Control Room
C) Hold the Path to the spreadsheet as an Environment Variable
D) Pass the Path as a Startup Parameter when the process starts
Correct Answer:

Verified
Correct Answer:
Verified
Q23: Which of the following accurately describes best
Q24: Using Surface Automation there is requirement to
Q25: Which of the following does the Blue
Q26: When using Surface Automation Blue Prism is
Q27: The following sub-page in a process creates
Q29: Which of the following techniques is most
Q30: Which of the following comments about Wait
Q31: When using Surface Automation which of the
Q32: Which of the following statements about the
Q33: Which of the following techniques is most