Consider the Following Process Flow: What Is the Problem

Question 44

Multiple Choice

Consider the following process flow: Consider the following process flow:   What is the problem with this flow? A)  There is nothing wrong with this flow. B)  The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly C)  The Attach Block should be enlarged to also include the 'Waited Long Enough?' decision stage. D)  The flow contains a recover stage and a route from it without a resume stage. This will cause internal error on future exceptions thrown in the same session. E)  The 0.5 second wait stage should be removed so that the retries can be performed at full speed. What is the problem with this flow?


A) There is nothing wrong with this flow.
B) The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
C) The Attach Block should be enlarged to also include the 'Waited Long Enough?' decision stage.
D) The flow contains a recover stage and a route from it without a resume stage. This will cause internal error on future exceptions thrown in the same session.
E) The 0.5 second wait stage should be removed so that the retries can be performed at full speed.