Multiple Choice
At what point should capacity requirements of a proposed system be first considered?
A) Leave it until the system is implemented and see if the system works O.K.
B) As early as possible
C) When the Development Manager has completed testing and passes the system to Operations for operational testing
D) Just before the system goes live
Correct Answer:

Verified
Correct Answer:
Verified