Short Answer
It takes an experienced CAD drafter 24 hours to complete a set of working drawings. Another CAD drafter takes 48 hours to complete a similar set of working drawings. What is the ratio of the first CAD drafter's time to the second CAD drafter's time?
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q1: Express 3 yd. 3ft. to 32 in.
Q2: Express the ratio 20:35 as a fraction
Q3: Express 4 ft. 6 in. to 18
Q5: What is the ratio of drawing to
Q6: Find the inverse ratio of 11/19:3/19 and
Q8: The ratio 2 1/2 to 3 can
Q9: Gear A has 60 teeth and gear
Q10: Ratios can be written as two numbers
Q10: Express the ratio 6/13:9/13 as a fraction