Multiple Choice
Quality control charts usually have a central line and upper and lower control limit lines. Which of the following is not a reason that the process being monitored with the chart should be investigated?
A) A large number of plots are close to the upper or lower control lines.
B) The behavior of the plots is erratic.
C) A single point falls above or below the control limits.
D) There is a change in raw materials or operators.
E) There is a run of five above the central line.
Correct Answer:

Verified
Correct Answer:
Verified
Q54: One hundred percent inspection is justified when
Q55: Variation that is inherent in a production
Q56: Process control is concerned with monitoring quality
Q57: Variation that is inherent in a production
Q58: It is impossible to have zero variability
Q59: Attributes are those quality characteristics that are
Q61: You want to determine the upper control
Q62: Designers establish specifications that solely define the
Q63: The value for "z" used in quality
Q64: You have just used the capability index