Multiple Choice
In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. All initial inventory values are 0. Use lot-for-lot method for order quantities for all items. What is the low level code (LLC) for B and C?
A) LLC for B is 2 and C is 1
B) LLC for both B and C are 2
C) LLC for B is 1 and C is 2
D) LLC for B is 0 and C is 1
E) LLC for all items are 1