Multiple Choice
Two technicians are discussing EPC solenoids. Technician A says the EPC solenoid is a PWW (pulse width modulated) solenoid and receives a duty cycle signal from the TCM. Technician B says the EPC solenoid is an on/off solenoid that is turned on when the TCM sees the 3-4 upshift. Who is correct?
A) A only
B) B only
C) both A and B
D) neither A nor B
Correct Answer:

Verified
Correct Answer:
Verified
Q35: Technician A measures sensors only when they
Q37: How does adaptive learning improve the shift
Q39: "Input split" and "compound split" are two
Q46: The EPC (electronic pressure control)solenoid is duty-cycle-controlled
Q50: The application of the TCC [torque converter
Q53: The MAP sensor is connected to the
Q53: Normally, the shift solenoids receive voltage through
Q54: To test a solenoid with an ohmmeter,
Q56: The _ is a voltage generating sensor
Q57: If the TCM loses source voltage, the