Multiple Choice
During the erection of concrete tilt- up wall panels, a gap is left between the bottom of a panel and the top of the footing. This gap is approximately
A) 1 in. to 2 in.
B) 2 in. to 3 in.
C) 1/2 in. to 1 in.
D) none of the above.
Correct Answer:

Verified
Correct Answer:
Verified